1/15/2024 0 Comments Scaffold guard rail![]() This provides temporary (but adequate) guard rail provision for the first lift, allowing personnel to ascend to the first lift. The handle member 34 can be hooked onto the guard rail 22 by means of the bolt 72 and slot 74, thereafter retaining the posts 32 in their upright position and thus retaining the guard rails 98 at the position shown in Fig. The guard rails 98 have swung up to a horizontal position alongside the standards 28. Personnel can now reach out from the base lift, remaining protected by the guard rail 22, to grasp the post 32 beyond the intemmediate arm 66, pulling down on the free end to swing the post 32 back to the upright position. The elongate threaded member may have an axis which does not intersect the member axis defined by the collar, whereby the threaded member obliquely engages a member received in the collar, to resist rotation of the collar relative to the member. The threaded arrangement may include an elongate threaded member rotatably mounted in the pivot arrangement to be advanced, by rotation, to grip a scaffolding member received in the collar. The collar may be shaped to fit over a scaffolding member, in use, whereby to support at least some of the weight of the device on the member prior to the threaded arrangement being tightened. The attachment arrangement may include a collar locatable around a scaffolding member, and a threaded arrangement operable to tighten against a member in the collar, to secure the attachment member to the member. The pivot arrangement may comprise an intermediate member which provides the attachment arrangement and a pivot axis defining arrangement at respective positions along its length. Preferably, the attachment arrangement attaches, in use, to a scaffolding ledger. ![]() E04G5/00- Component parts or accessories for scaffolds.E04G- SCAFFOLDING FORMS SHUTTERING BUILDING IMPLEMENTS OR AIDS, OR THEIR USE HANDLING BUILDING MATERIALS ON THE SITE REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS.Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.) Filing date Publication date Application filed by Safety & Access Products Ltd filed Critical Safety & Access Products Ltd Priority to GB0401463A priority Critical patent/GB2410288B/en Publication of GB0401463D0 publication Critical patent/GB0401463D0/en Publication of GB2410288A publication Critical patent/GB2410288A/en Application granted granted Critical Publication of GB2410288B publication Critical patent/GB2410288B/en Status Expired - Fee Related legal-status Critical Current Anticipated expiration legal-status Critical Links Original Assignee Safety & Access Products Ltd Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.) ( en Inventor S Hughes P Hogan Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.) Granted Application number GB0401463A Other versions GB0401463D0 Google Patents Pivoting scaffold guard rail deviceÄownload PDF Info Publication number GB2410288A GB2410288A GB0401463A GB0401463A GB2410288A GB 2410288 A GB2410288 A GB 2410288A GB 0401463 A GB0401463 A GB 0401463A GB 0401463 A GB0401463 A GB 0401463A GB 2410288 A GB2410288 A GB 2410288A Authority GB United Kingdom Prior art keywords post arrangement pivot guard rail scaffolding Prior art date Legal status (The legal status is an assumption and is not a legal conclusion. Google Patents GB2410288A - Pivoting scaffold guard rail device GB2410288A - Pivoting scaffold guard rail device
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |